History: 2003: Connecting bridge Offshore platform Kizomba
The client required a connecting bridge and a work pontoon on the Caland Canal to complete an offshore platform.
Janson Bridging installed a Heavy Girder bridge, hinged to the work pontoon on the waterside and slid onto the bank on the landside.
The bridge had a length of 38 meters and a driving width of 6 meters.
Détails du projet
Solution
Pont à sections
Type
JPB-T
Largeur totale
38,1 meter
Largeur de surface de roulemen
5,7 meter
Poids propre
118 ton
Charge de conception
Vehicle 50 tons
Date d'installation
January 2003
Date de démantèlement
November 2003