History: Highway bridge Waalwijk (NL)

Replacement of the A59 bridge over the Drongelens Canal

After 60 years, the bridge over the Drongelens Canal near Waalwijk was due for replacement. Over the years, the (heavier) traffic on the A59 increased considerably. A new bridge was necessary to guarantee safety and traffic flow in the future.


During the work (2015–2016), the A59 remained accessible thanks to a temporary bridge construction next to the existing bridge. A fine example of infrastructure planning and collaboration.


#infrastructure #JansonBridging #A59 #mobility

Partager sur :

Détails du projet

Solution
Pont à poutres à âme pleine
Type
JSB
Largeur totale
66 + 33 mtr
Largeur de la route
2 x 7,5 mtr
Poids propre
730 tons
Rail de sécurité
Half step barrier system H2W1
Temps d'installation
5 days
Charge de conception
LM1 and LM2 (NEN-EN 1991-2) CC3
Pont à poutres à âme pleine