Pedestrian bridge 106x3m Nieuwegein
In 2016, the combination 'Sas van Vreeswijk BV' was awarded the contract for the design, construction, maintenance and financing of a third lock and widening of the Lekkanaal.
For this purpose, a ramp was needed to divert light traffic on site. A temporary bicycle bridge was chosen over the new lock bell to be constructed, from the lock to the Kazernedok, a local road.
Janson Bridging constructed a bicycle bridge from stock with a total length of 106 metres, consisting of three partial spans of 39, 33 and 33 metres.
Détails du projet
Solution
                Pont piétonnier
            Type
                JPB-P
            Largeur totale
                106 m (35 bays)
            Largeur de surface de roulemen
                3 m
            Poids propre
                105 ton
            Charge de conception
                5 kN/m²
            Date d'installation
                September 2016
            Période de location
                10 months
            Temps d'installation
                3 days
            