Temporary bridge Terherne

In Terherne, the task was to replace an existing movable bridge with a new one to ensure safe use in the future. To keep the traffic flow, especially for road traffic, as smooth as possible, the contractor opted for a temporary traffic bridge that was 15 meters long. Recreational vessels up to a height of 2.40 meters could still pass under the fixed bridge. However, occasionally, a taller vessel needed to use the Zandsloot and pass through the bridge.

To accommodate this, a clever solution was chosen with two positions: a low position for road traffic and a high position for maritime traffic. Moving the bridge from the low to the high position was carried out using a mobile crane, which was done only a few times due to the complexity involved.

The construction work was delayed by a year due to the COVID-19 pandemic.

The technical sophistication of this project lies mainly in the innovative choice of the bridge's low and high bearing positions. For more details, you can

Partager sur :

Détails du projet

Solution
Pont à poutres à âme pleine
Type
JSB
Largeur totale
15 m
Largeur de surface de roulemen
3,5 m
Hauteur de section
1,06 m
Poids propre
25 ton
Date d'installation
10-09-2022
Charge de conception
Eurocode LM1
Pont à poutres à âme pleine